Siemens Energy ENR.DE
What does Siemens Energy do?
Siemens Energy is an energy technology group that supplies technology for the generation, transmission and storage of energy. The offering ranges from gas and steam turbines and generators to high-voltage direct current transmission, grid connections for offshore wind farms and transformers, as well as switchgear, circuit breakers and digital grid solutions. In addition, there are electrolyzers, heat pumps and industrial steam turbines.
The company earns money from new business in large plants and projects as well as from the higher-margin service business, which includes maintenance, modernization and performance upgrades of installed plants. Customers are utilities, grid operators, industrial companies and project developers. Reporting is divided into the segments Gas Services, Grid Technologies, Transformation of Industry and Siemens Gamesa. In competition, Siemens Energy is among the few global providers in gas turbines and grid technology with a broad installed base, which creates high barriers to entry. Competitors include GE Vernova, Mitsubishi Heavy Industries, Hitachi Energy and Schneider Electric. In the wind business, Siemens Gamesa competes with other turbine manufacturers.
Score profile
Rank vs. Specialty Industrial Machinery (54 companies). 10 = top of the group, 5 = middle. Calculated from the metrics below, without AI.
Metrics compared with the industry
On profitability and quality, Siemens Energy ranks in the middle in the group Specialty Industrial Machinery (4.2/10). On growth, the company ranks among the best in the group Specialty Industrial Machinery (9.4/10). On valuation (higher = cheaper), the stock ranks above average in the group Specialty Industrial Machinery (6.7/10). On financial strength, Siemens Energy ranks in the middle in the group Specialty Industrial Machinery (5.6/10).
| Metric | Stock | Group median | Ranking |
|---|---|---|---|
| Forward P/E | 15.2x | 18.1x | better than 71 % |
| Trailing P/E | 30.0x | 26.0x | better than 39 % |
| PEG ratio | 0.3x | 1.7x | better than 98 % |
| EV/EBITDA | 15.9x | 15.7x | better than 46 % |
| Price/sales | 2.5x | 2.6x | better than 55 % |
| Price/book | 9.9x | 4.1x | better than 7 % |
| Revenue growth | 23.0% | 7.6% | better than 88 % |
| Earnings growth | 673.8% | 12.6% | better than 99 % |
| Gross margin | 22.3% | 40.2% | better than 5 % |
| Operating margin | 11.5% | 15.5% | better than 32 % |
| Net margin | 8.6% | 10.2% | better than 38 % |
| Return on equity | 36.9% | 14.4% | better than 94 % |
| Debt/equity | 25.4% | 45.7% | better than 79 % |
| Current ratio | 0.9x | 1.7x | better than 5 % |
| Free cash flow yield | 5.7% | 3.3% | better than 86 % |
| Dividend yield | 0.5% | 1.3% | – |
| Payout ratio | 16.0% | 34.2% | – |
| Beta | 1.86 | 1.07 | – |
Valuation: what is Siemens Energy worth?
Two valuation approaches – a discounted cash flow model and a valuation at the industry’s median multiples – give Siemens Energy a model range of 129.75 EUR to 210.80 EUR per share.
28 analysts, average rating “Buy”, average price target 191.89 EUR (+46.2%).
The full DCF matrix, the reverse DCF (what growth the price implies) and scenarios are part of the Pro analysis.
What the business depends on
- Investment in power grids and grid connections drives demand for transformers, switchgear and high-voltage direct current technology.
- The need for firm power plant capacity supports new gas turbine business and the long-term service business on installed plants.
- Manufacturing utilization and project execution determine the profitability of large, long-running orders.
Risks
- Quality problems and cost overruns in the wind business can significantly weigh on earnings and liquidity.
- Large projects carry execution, supply chain and price risks, for example for raw materials and intermediate products.
- Political funding decisions, permitting procedures and cycles in energy policy influence order intake and the timing of investments.
What to look for with Siemens Energy
The order backlog in relation to revenue is informative because, given long project durations, it shows future capacity utilization and the predictability of revenues.